Neasden Depot Upgrade - London Underground |
|
Following our successful tender bid for the above contract GB Heating Services worked closely with Bex Plc and BAM Nuttall provided a multi-discipline services installation from their design providing the following:-
- Provide working drawings along with builders work details.
- Installed heat recovery units complete with ductwork systems to Classroom areas.
- A full range of Stelrad "Elite" steel panel radiators c/w thermostatic radiator valves.
- Flow & Return pipework to all plant and radiators is installed in steel.
- Ideal Icos 30HE boilers installed in modular format c/w pumps and controls.
- Provide a pre-insulated CWS tank and domestic hot and cold services via plant. room calorifier to all WC areas, cleaners sink and domestic kitchen.
- Extract ventilation to all WC areas.
- Provided local extract fans and controllers including wall mounted heat recovery units.
- Complete pipework and ductwork insulation by specialist contractor.
- Installed a VRF air conditioning system comprising 17 indoor units and 2 external air cooled condensers complete with refrigeration lines to serve all Classrooms.
- Installed UPVC above ground drainage system.
- Provide steel gas service pipe-work to boiler plant via external meter.
- HVAC control panel and field wiring to all plant and equipment.
- Supply and install specified sanitary ware.
- Carry out water treatment and full chlorination.
- Test and commission all plant and provide test certificates and operational manuals.
|
Heath Robinson Memorial Trust, West House, Pinner |
|
Following our successful tender bid for the above contract GB Heating working closely with WR Associates have successfully provided a multi-discipline services installation from their design providing the following:-
- Provide working drawings.
- Modify water and gas services providing check meters to each respective system.
- A full range of Stelrad "Elite" radiators c/w thermostatic radiators valves and copper flow & return circuits.
- Install Hoval Topgas 45 fully condensing boiler along with Toptronic controller and pressurisation set.
- Domestic hot and cold services via calorifier to all WC areas, kitchens, staff and bar area.
- Hoval Solar panels installed on flat roof c/w twin coil solar cylinder and interfaced controls.
- Extract ventilation ancillary areas.
- Full heat recovery system to public toilets only at ground and first floor areas
- Air conditioning twin system complete with refrigeration lines to serve Cafe area at ground floor.
- Above ground UPVC drainage system.
- Provide steel gas service pipe-work to boiler plant, kitchen cook-line and 2nd floor future use.
- Install clients chosen sanitary ware.
- Test and commission all plant and provide test certificates and operational manuals.
|
|
|